April 27, 2008
Gary showed up after church and helped hubby with the moldings. He finished some of the caulking on the roof while hubby finished constructing the window sills. Hubby cut and installed the fluted trim and rosettes around the door. There was one small setback when hubby was hanging the trim work around the door- he accidentally nailed the door shut. Luckily it was only one nail so it was a quick fix. I patched, sanded, and painted while they worked on moldings. Unfortunately, the decorative molding proved to be more difficult to hang than anticipated. The molding itself was made at a different angle than most moldings which meant that the miter cuts had to be done differently. It didn’t take them long to find a solution and in a short period of time the molding was hung. Gary left once the molding job was complete. Hubby cut and installed the fluted trim and rosettes around the two smaller windows and then installed the window sills. I filled the nail holes and did some more painting. Aside from hubby nailing the bathroom door shut and the odd miter angles for the molding the day progressed rather well.

April 28, 2008
I did some painting and sanding this evening. I filled the nail holes on the window sills and sanded the holes that I filled yesterday on the trim work. Then I painted the window trim and the moldings in the old section of the bathroom. I must say that the carved decorative molding is beautiful but it is a bear to paint. It’s hard to get the paint into all of the carved lines. It was well worth it though!

One more addition, or should I say correction? Hubby read the bathtub diary updates last night and informed me that he DID NOT nail the door shut on Sunday but in fact the nail did it. He explained that the nail just went through the wood its own way and nailed the door shut. I just wanted to make that correction so that it was clear to everyone that hubby didn’t nail the door shut-the nail did it.

April 29, 2008
I arrived home today to find hubby caulking the rest of the moldings in the bathroom. Later I heard him grumbling. A short time after that he came into the kitchen with the fan vent cover which he had accidentally stepped on and broken (it was drying on the floor after being painted a few days ago). He calmly found the superglue and began gluing each of the little vent pieces back on.

April 30, 2008
Hubby finished caulking the moldings. I painted the moldings in the new section of the bathroom and put a second coat on all of the window and door trims and the moldings in the old section of the bathroom.

May 1, 2008
The switch plates and outlet covers arrived today-they are beautiful and will look great in the bathroom.
Hubby started working on the back board for the tile flooring on the platform. He finished about 2/3 of it.

May 2, 2008
My electrician came out to finish the electrical work and hang the light fixtures. This helped to clear a path in the Abyss so now hubby can get to his clothes easier (the boxes of light fixtures were stored in the spare bedroom). The lights look beautiful! He (electrician) also installed the switch plates, outlet covers, and the medallion for the center chandelier.